Case Study

Installing Super-Heavy Large Equipment

Tasks of moving

  • Difficult to install the equipment in the innermost place due to its heavy weight
  • Troublesome because it is needed to place an order for multiple contractors when working on several construction projects

Introduce a portal crane in the installation area and
reduce the number of days required for work and costs by half!

To install large equipment over 50t in the innermost place in a small factory with a small opening and low ceiling, many workers and man-hours are required, because the equipment cannot be lifted with a truck crane with a boom extended.

Sun Engineering promptly installs it in the innermost place by introducing a portal crane in the installation area, lifting the large equipment and passing over any machinery. This method drastically reduces the amount of required labor and man-hours for setup work and even halves the number of days for work and costs. It also contributes to improving the safety of setup work by reducing man-hours and providing several cases of one-stop contracted setup work on the same premises for the ease of customers.

Key Points for Disassembly and Assembly

Preparation for Setup

All we need to do on-site is to set up a portal crane, which is easy to assemble and disassemble and place rails. Therefore, there is no need to perform sheet iron curing which requires a lot of labor and it reduces the clean up by half.

Setup Work

It can be moved to the installation location with a portal crane and set up on the stand with different elevation quickly. Therefore, labor can be drastically reduced compared to the method of aligning it with the target height using a jack.